Skip to content

On-Premises Server → Microsoft Azure Migration

Retire aging physical servers & eliminate hardware failure risks forever

From
Aging physical Windows / Linux servers
To
Microsoft Azure (Azure Virtual Machines)
Price
Starting at $3,000
Duration
Approx. 2–4 Weeks
Overview

What you get

End hardware end-of-support (EOSL), physical server failures and the work of maintaining servers on premises. Moving your Windows/Linux workloads to Microsoft Azure gives you a more robust, scalable and secure IT environment.

  • Removes the risks of hardware end-of-support, power outages and physical failures
  • Pay only for the resources you use, with autoscaling (and save on electricity and cooling)
  • Strong security and redundancy in Microsoft's high-standard data centers
  • Smooth connections from home and remote offices, with no VPN or with a secure VPN
Rows of server cabinets in a modern data center
Before and after

What changes after the migration

BEFORE: Legacy On-Premises Infrastructure

  • Hardware End-of-Life and physical disk failure risks
  • Power outages and physical site risks
  • High hardware maintenance and replacement costs
  • Limited scalability when additional resources are required

AFTER: Modern Microsoft Azure Infrastructure

  • Eliminate physical server hardware and the risks of hardware failure
  • Scale computing resources as your business grows — without buying new hardware
  • Reduce ongoing hardware maintenance and infrastructure management costs
  • Deploy new servers and resources in minutes instead of waiting for hardware procurement
  • Access business applications securely from virtually anywhere
  • Build a flexible infrastructure that can adapt to changing business needs
How it runs

Five steps, one engineer

  1. Pre-migration assessment (current server specs, traffic, data volume and dependencies)
  2. Azure environment design (virtual network, access control and security policies)
  3. Migration rehearsal and data sync testing (checked so daily work is not affected)
  4. Production cutover at night or on a weekend (minimal downtime)
  5. Post-migration checks, client connection checks and operational support
Price

Starting at $3,000

Approx. 2–4 Weeks

30-day post-migration stabilization warranty. Every migration includes pre-migration audits, design, dry-run testing, a weekend cutover, user connectivity checks and documentation.

  • Azure
  • Windows Server
  • Azure VM
  • Cloud Migration
  • BCP
FAQ

Questions about migrations

What is included in the Cloud Migration service?
It includes complete pre-migration workload audits, Microsoft 365 / Azure tenant architecture design, data transfer staging, dry-run testing, weekend cutover to minimize business disruption, user connectivity checks, documentation, and a 30-day post-migration stabilization warranty.
What can we cover during the 1-Hour Free Consultation?
Anything related to your IT environment! Common topics include: software and cloud licensing optimization, auditing cloud cost waste, planning an on-premise server migration to Azure, resolving sluggish office Wi-Fi, reviewing your cybersecurity posture, or scoping new employee PC onboarding. We provide honest technical advice and an instant cost estimate.

Planning a migration?

Start with a free 1-hour consultation: honest technical advice on your environment, and a cost estimate.

Or email info@makeitworks.net
Free · No obligation

Book a free 1-hour consultation

Talk directly with a Microsoft-certified engineer. You get honest technical advice and a cost estimate.

Preferred consultation format
Topics you would like to discuss (choose any)

Your request is sent to info@makeitworks.net.